防盗门灌浆机
1. 适应灌浆材料的运输: 腻子粉, 画, 乳胶漆, 真石漆, 水泥砂浆, 干砂浆, 保温砂浆, 防水材料, 防火材料, 隔热材料, 吸声材料及其他水溶性材料.
2. 调整流量大小调出效果.
3. The electric control box can be switched.
4. The connection of the feeding tube can be rotated for easy operation.
5. High construction efficiency and good quality.
6. Small size, easy to carry on site, and low cost of accessories, simple maintenance.
7. Easy to use, fast, save materials, save labor, and save money.
8. Material ratio (水泥) 0.7:3 mortar
Product use:
Suitable for cement grouting during security door installation, caulking of door frame and aluminum alloy bed frame, caulking, jointing and reinforcement of large hydraulic engineering, filling epoxy resin glue, bolt grouting, ETC. Cracks caused by earthquakes, ETC。, are professional caulking tools for door and window installation projects.
特征:
1. Compact and simple structure, excellent performance and reasonable price.
2, the use of single-phase 220V power supply, small size, easy to move, easy to operate and maintain.
3, can be poured under 3mm of various construction mortar, with special joints, can be continuously grouted.
4. Passive boost. When the slurry is filled, the pressure is gradually increased to facilitate control and maintain the grouting pressure.
5, can be used for surface layer spraying operations (requires spray gun and air compressor)
干喷机操作安全指标
1. 连接电源线时, 连接抗拉强度, 电缆接口密封, 以及防爆表面的保护.
2. 喷浆机喷洒材料时, it is necessary to prevent long and large metal blocks such as bolts and nuts from entering the material chamber to avoid accidents caused by the machine.
3. When the dry shotcrete machine operation is carried out, the main engine operator should observe the pressure of the gas pressure gauge at any time. If the air pressure is abnormally high, the feeding should be stopped. After the working state of the gas circuit is normal, it will enter normal operation.
4. The components and important components and raw materials in the shotcrete machine are all selected to meet the requirements of the standard. The user shall not replace it at will. If it is necessary to replace it, the components or raw materials that meet the relevant standards shall be selected.