Two-stage arrangement of the dry mortar production line

///Two-stage arrangement of the dry mortar production line

Two-stage arrangement of the dry mortar production line

Two-stage arrangement of the dry mortar production line The raw material storage silo is moved from top of mixer to the ground.Raw material storage silo placed next to the main building of mixer. The materials in the silo is translated by screw conveyor to weighing hopper which is on the ground. Then lifted by bucket elevator to premix silo. In order to avoid the lifting time to extend the production cycle, set premix silo above the mixer, making the measurement, mixing, packaging in time in parallel

Model:
Bucket elevator.
Raw materials silo(20ton-500ton)
Screw conveyor.
Weighing hopper
Dust collector.
Bucket elevator.
Premix silo
Pneumatic buttery fly
Double shaft agravic mixer(2m³-6m³)
Finished product silo.
Valve packing machine(single month or double month).
Air compressor.
Steel structure.
Automatic control cabinet.

2017-07-03T17:26:16+08:00 July 3rd, 2017|Mortar mixer s|